SAFE AND CERTIFIED SOLUTIONS FOR LIFTING AND HANDLING
Lifting and handling systems
Metech designed and manufactured special lifting bars and hooks for WLL from 30 Kg to 300 Tons, for ship building, metal, petrochemical, energy, and industrial building areas.
A widespread need in productions is a safe handling of high economic value materials, sometimes of exceptional size and load, without risk to things and people.
To this aim the lifting process should be carefully evaluated, thus granting special devices for handling meeting the increasingly strict safety regulations.
Lifting system should be designed with a safe and reliable resting support and efficient use of the workspace.
The Metech-Secure-Method
Highest level of security is one of our essential commitments. It is achievable through following mandatory steps:
- Kick-off meeting to identify handling and lifting needs and consulting to find out proper solution.
- Tailored design of lifting solution complying security regulations.
- Meticulous selection of raw materials and traceability of the supply chain.
- Welding according to standards (EN ISO 5817 et al.).
- Manufacture and testing of custom-made devices, CE marking and issue of Declaration of Conformity.
- Commissioning of the lifting system and technical staff training.
- Ongoing support and preventive maintenance planning.
- Compliance Inspections to satisfy regulation requirements.
Welding pursuant to standard
An approved welding process allows to perform an objective evaluation of existing welding imperfections through compliance inspection. Approved welding ensures security and structural solidity of the item.
Metech performs non-destructive testing on all weldings.
Type of Non-Destructive Test (NDT)
- Surface: Visual Test (VT), Magnetic Test (MT), Penetrating liquid Test (PT)
- Volumetric: Radiographic Test (RT) and Ultrasonic Test (UT)
Metech key-points ensuring restful nights to our customers:
- Timely technical information provided by our engineering office.
- Full compliance with design and construction regulations.
- Focus on ergonomics from early steps of project development.
- Manufacture and welding according to UNI EN 1090-2 and EN ISO 3834-2.
Carried out projects about lifting systems
- WLL 50 Tons lifting device with adjustable cars for crankshafts
- WLL 350 Tons lifting device with hydraulic attuators and load cells for large engines
- Lifting device suitable for high temperatures items for handling hardening baskets
- Lifting and rotation pliers for 1300 Kg electric stators.
- WLL 15 Tons lifting device for crane towers